

8.26.2008 | Posted by Anonymous at 6:51 PM 2 comments
Labels: brick, construction, contractors, decorating, design, DIY, do it yourself, drystack, drywall, electrical, faux finish, gas range, HVAC, interior design, kitchen, kitchen remodeling, plumbing
I haven't posted in a while - mainly because summer is always crazy for us. But throw in the complete overhaul of turning a 2 car garage into a gorgeous living room and the complete gutting of our kitchen and remodeling the rooms it abuts, and you have negative time left.
When I last posted, we had just finished the office addition and moved in, and we had started transforming the garage into our new living room. Considering how long it took us to finish the addition (new construction + permits, inspections and therefore, extra time), it took almost no time to get the living room all but finished.
BEFORE:
AFTER:
Not bad, eh? Here is another angle:
BEFORE:
AFTER:
Next time: I will start posting about the kithen demo.
8.21.2008 | Posted by Anonymous at 12:44 PM 0 comments
Labels: builders, construction, contractors, decorating, design, DIY, do it yourself, drywall, electrical, interior design, kitchen remodeling, new addition, painting, renovations
OK, so I already mentioned that we moved into the office and have started the transformation of the new living room. DH worked his tail off to get the drywall hung, and I even helped a bit! We waited forever for our drywall finisher to get back to us, and he was supposed to start two days ago, but never showed. But he assures us that he is coming tomorrow at 7AM to get on it and if he does, it really should only take him a few days to finish it. DH already started the finishing, so that will save us money on this guy's labor.
Meanwhile, we started brainstorming and browsing for kitchen remodel ideas. We're drooling over the new Electrolux appliances that have induction cooktops, but we haven't justified the acquisition of one. We really aren't sure if it would be worth having one, and unless we buy a drop-in, we can' get one with 6 burners like we planned on getting. So, we are leaning towards getting another built-in range like we bought in Vermont. I just dread having to clean those grills, but it isn't the end of the world, I suppose. Gas heat is the best. It is exciting to be at this point of the renovations, but the end result still seems so far away. I keep hoping that we can have a celebration party in our "new home" this fall, but I know better than to be too optimistic. We have done this so many times that I know that having unrealistic expectations only adds unnecessary stress to an already stressful project. Don't get me wrong, we love to do this type of stuff (or we wouldn't have done it so often), but there is a percentage of stress for every 10% of fun you get out of renovating a house.
I'll post some pics of our current kitchen after I take a few - this will be an amazing before & after job...can't wait for the after!!!
5.23.2008 | Posted by Anonymous at 12:46 PM 0 comments
Labels: builders, closets, construction, contractors, decorating, design, DIY, do it yourself, drywall, Electrolux, gas range, induction, interior design, kitchen, kitchen remodeling, renovations
It's our motto! Even though we will likely be able to move into our new office this weekend, it is contingent upon whether the drywall finisher is done by then and we've been able to paint. That is the hope. But, in the meantime, my husband began ripping out the old ceiling in the old garage last night. This room will become our new living room when it is done. We already installed radiant heat under the new sub floor, and soon we will be able to erect the walls for the closets and enclosures before doing more drywalling. It keeps us going...
4.23.2008 | Posted by Anonymous at 12:13 PM 0 comments
Labels: builders, closets, construction, contractors, DIY, do it yourself, drywall, new addition, radiant heat, renovations, sub floor
It has been just over a year (1 year and 6 days, to be exact) since we broke ground on our new addition. Since my husband and I (but mostly my husband) have done 80% of the work, it has taken much longer than we initially projected. Travel, work, socializing and the like seems to squeeze in between stages of construction and renovation. Oh, and inspections. We are fortunate to know people in the world of HVAC, plumbing and electric, so having those parts covered were big money savers. My husband did almost all the plumbing himself; his father is an electrical engineer and did all of our wiring; a good friend of ours owns an HVAC company who did most of our heating and A/C work (although he and my husband did a lot of the busy work themselves after hours). Knowing all of these people in the industry also led us to great contacts for other parts of the job - the 20% we contracted out (drywall finisher, carpenters (who framed the addition after the slabs were poured), and siding contractors). So, had it not been for us doing most of the work, we would have paid LOTS more and it would have been done probably last fall. But I am fine with how it has turned out. We made a lot of design changes along the way, as well as some mistakes. I can't wait to post the final outcome.
4.19.2008 | Posted by Anonymous at 8:17 AM 0 comments
Labels: builders, construction, contractors, decorating, design, DIY, do it yourself, drywall, electrical, HVAC, interior design, new addition, plumbing, renovations, siding