8.26.2008 | Posted by Anonymous at 6:51 PM 2 comments
Labels: brick, construction, contractors, decorating, design, DIY, do it yourself, drystack, drywall, electrical, faux finish, gas range, HVAC, interior design, kitchen, kitchen remodeling, plumbing
I haven't posted in a while - mainly because summer is always crazy for us. But throw in the complete overhaul of turning a 2 car garage into a gorgeous living room and the complete gutting of our kitchen and remodeling the rooms it abuts, and you have negative time left.
When I last posted, we had just finished the office addition and moved in, and we had started transforming the garage into our new living room. Considering how long it took us to finish the addition (new construction + permits, inspections and therefore, extra time), it took almost no time to get the living room all but finished.
BEFORE:
AFTER:
Not bad, eh? Here is another angle:
BEFORE:
AFTER:
Next time: I will start posting about the kithen demo.
8.21.2008 | Posted by Anonymous at 12:44 PM 0 comments
Labels: builders, construction, contractors, decorating, design, DIY, do it yourself, drywall, electrical, interior design, kitchen remodeling, new addition, painting, renovations
It has been just over a year (1 year and 6 days, to be exact) since we broke ground on our new addition. Since my husband and I (but mostly my husband) have done 80% of the work, it has taken much longer than we initially projected. Travel, work, socializing and the like seems to squeeze in between stages of construction and renovation. Oh, and inspections. We are fortunate to know people in the world of HVAC, plumbing and electric, so having those parts covered were big money savers. My husband did almost all the plumbing himself; his father is an electrical engineer and did all of our wiring; a good friend of ours owns an HVAC company who did most of our heating and A/C work (although he and my husband did a lot of the busy work themselves after hours). Knowing all of these people in the industry also led us to great contacts for other parts of the job - the 20% we contracted out (drywall finisher, carpenters (who framed the addition after the slabs were poured), and siding contractors). So, had it not been for us doing most of the work, we would have paid LOTS more and it would have been done probably last fall. But I am fine with how it has turned out. We made a lot of design changes along the way, as well as some mistakes. I can't wait to post the final outcome.
4.19.2008 | Posted by Anonymous at 8:17 AM 0 comments
Labels: builders, construction, contractors, decorating, design, DIY, do it yourself, drywall, electrical, HVAC, interior design, new addition, plumbing, renovations, siding