Showing posts with label plumbing. Show all posts
Showing posts with label plumbing. Show all posts

Kitchen Remodel

I'm getting lots of requests to post pictures of the kitchen remodel, so I'm going to attempt a few now. Right now we're awaiting the installation of our quartz countertops, and we still have to install the pendant and undercabinet lights. Meanwhile, Jason has laid almost 1000 pieces of tile in the entire upstairs common areas - a combo of 18" x 18", 12" x 12" and 6" x 6" tiles. The kitchen was done over a month ago since it needed to be done in order for the cabinets to be installed. But now we have to grout the other areas. No small task. Poor Jason is stuck with the brunt of the work since I hurt my knee and can only do limited time kneeling on hard tile flooring. But, I digress.

First, some "before" pictures of the kitchen. It was very closed in, and also house a large laundry closet where the washer/dryer resided (I now have a laundry area in the basement with a large section of the base cabinets and countertop we repurposed from the old kitchen):














You can see in the second picture that there is a wall adjacent to the brick hearth in the living room. These pictures were taken prior to our purchase of the house in 2006. We have since taken that wall out and opened up the entire area in order to create a more open floorplan. Here are some pictures of the demolition:






The installation of the cabinets:


Of course, I'm saving the best for last - no more pictures until it is nearer to completion with lighting and installed appliances!!

Looking To Move In

It has been just over a year (1 year and 6 days, to be exact) since we broke ground on our new addition. Since my husband and I (but mostly my husband) have done 80% of the work, it has taken much longer than we initially projected. Travel, work, socializing and the like seems to squeeze in between stages of construction and renovation. Oh, and inspections. We are fortunate to know people in the world of HVAC, plumbing and electric, so having those parts covered were big money savers. My husband did almost all the plumbing himself; his father is an electrical engineer and did all of our wiring; a good friend of ours owns an HVAC company who did most of our heating and A/C work (although he and my husband did a lot of the busy work themselves after hours). Knowing all of these people in the industry also led us to great contacts for other parts of the job - the 20% we contracted out (drywall finisher, carpenters (who framed the addition after the slabs were poured), and siding contractors). So, had it not been for us doing most of the work, we would have paid LOTS more and it would have been done probably last fall. But I am fine with how it has turned out. We made a lot of design changes along the way, as well as some mistakes. I can't wait to post the final outcome.